Installation of New PSIO Module

1. Verify if the existing PSIO module is defective, by using the procedure described in the

Notes on Module Operation

section, and

Control Modules

section. Do not select the Attach

to Network Device table if the LID displays communication failure.

2. Data regarding the PSIO configuration should have been recorded and saved. This data will

have to be reconfigured into the LID. If this data is not available, follow the procedures

described in the

Set Up Machine Control Configuration

section. Record the TOTAL

COMPRESSOR STARTS and the COMPRESSOR ONTIME from the STATUS01 table on

the LID.

If a CCN Building Supervisor or Service Tool is present, the module configuration should

have already been uploaded into memory; then, when the new module is installed, the con-

figuration can be downloaded from the computer (if the software version is the same).

Any communication wires from other machines or CCN modules must be disconnected.

3. Check that all power to the unit is off. Carefully disconnect all wires from the defective

module by unplugging the 6 connectors. It is not necessary to remove any of the individual

wires from the connectors.

4. Remove defective PSIO by removing its mounting screw with a long-shaft Phillips

screwdriver, and removing the module from the control box. Save the screw for later use.

The green ground wire is held in place with the module mounting screw.