4.7 Test Run Checklist

4.7 Test Run Checklist

Review the checklist before performing a test run. Check each item that applies.

No.

Checklist

Page

1

Thoroughly read the manual before performing a test run.

2

Check the

Wiring Checklist on page 83

.

83

3

Set the correct power supply voltage.

94

4

Turn on the power supply to the converter and drive.

94

5

Correctly sequence the Run commands.

97

6

The

should light after giving a Run command.

7

To give Run command and DC bus voltage reference from the digital operator, press

key to set

to LOCAL.

87

,

93

8

To give Run command and DC bus voltage reference from the control circuit terminals, press the

to set REMOTE. (The LO/RE indicator is lit off while REMOTE is set.)

93

RE

LO

RE

LO