This section explains how to connect the converter to a MEMOBUS/Modbus network and the network termination
required for a connection.

Network Cable Connection

Follow the instructions below to connect the converter to a MEMOBUS/Modbus network.

1.

With the power shut off, connect the communications cable to the converter and the master. Use terminals TB5
for MEMOBUS/Modbus.

Figure C.2

Figure C.2 Serial Communications Cable Connection Terminals (TB4)

Note: Separate the communications cables from the main circuit cables and other wiring and power cables. Use shielded cables for the

communications cables, and properly shielded clamps to prevent problems with electrical noise. When using RS-485
communications, connect S+ to R+, and S- to R- as shown in the diagram below.

2.

Check or set the termination resistor selection at all slaves. Use the description in

Network Termination on

page 209

for slaves that are converters.

3.

Switch the power on.

4.

Set the parameters needed for serial communications (H5-01 through H5-12) using the digital operator.

5.

Shut the power off and wait until the display on the digital operator goes out completely.

6.

Turn the power back on.

7.

The converter is now ready to begin communicating with the master.

(TB4)

S–
S+
R–
R+
IG

Send (–)
Send (+)
Receive (–)
Receive (+)
Shield Ground

IG R+ R- S+ S-

YEG

YAI

TOEP_C710656_07C_2_0.book 206 ページ 2015年1月9日 金曜日 午後6時23分

Advertising