Cost optimisation factors

Of course, costs are directly associated with the service factors and service durations of the individ-

ual drive components.

• Overdimensionings can render a drive system unattractive very quickly.
• Underdimensionings may make the drive system seem attractive at first. However, high follow-

up costs and damage to the company's image can occur if the drive does not perform the tasks

required.

Tip!
When carrying out dimensionings, always follow the principle "Not more and not less than

required!"

Here the user has to make the best decisions with the help of the wizard in the DSD.

• For this purpose, the following table specifies important decision parameters with regard to

costs:

Parameter

Effect

Notes

Gearbox size

Effect on useful life

Torque overload factor of the motor Effect on motor size
Operation at least to the rated motor

speed

Effect on motor size and controllabil-

ity

Otherwise the inverter is not opti-

mally utilised

Load-matching factor K

J

Effect on control quality and dynam-

ics

Selection of optimal motion profile

Can affect motor size and K

J

Selection of the correct rated motor

speed

High rated speed reduces size

Observe max. permissible input

speed of the gearbox and acoustic

emission!

Selection of optimal field weakening

factor K

F

Has a considerable impact on the size

of the inverter, especially in the case

of winding drives

Use of 87 Hz operation

Reduces the motor size

• In the case of winding drives, only

reasonable for a very low winding

ratio q

Selection of the switching frequency At 16 kHz only 2/3 of the rated power
Selection of 1-phase inverters at a

power of ≤2.2 kW

Is cheaper than three-phase inverters

at the same power

Selection of double-axis modules

Servo-Inverter i700

Reduced costs for inverters

DC-bus operation

• Reduced mains load

• Improved energy efficiency