How to set up the powermonitor 5000 unit – Rockwell Automation 1426 PowerMonitor 5000 Unit User Manual

Page 44

Advertising
background image

44

Rockwell Automation Publication 1426-UM001F-EN-P - November 2013

Chapter 3

Setup

How to Set Up the PowerMonitor 5000 Unit

From any power monitor web page, click the Configuration folder. A list of
available configuration pages is displayed in the tree. The steps for entering,
editing, and applying configuration parameters are similar for each configuration
page. The configuration parameters and their properties are described nin the
following chapters:

Chapter 4

,

Metering

.

Chapter 5

Power Quality Monitoring

Chapter 6

Logging

Chapter 7

Logic Functions

Chapter 8

Other Functions

The configuration pages contain text boxes for entering parameter values, pull-
down menus for selecting enumerated parameter values, and an Apply Changes
button for committing changes to the power monitor. The power monitor
checks that parameter values are within their valid range before applying them. A
dialog box appears to report the success or reason for failure of an attempt to
apply new parameters.

Basic Metering Setup

Follow these steps to configure the basic metering parameters.

1.

Click the Metering_Basic page under the open Configuration folder.

This page displays the existing basic metering configuration of the power
monitor, including the metering mode, PT (VT) and CT ratios, nominal
voltage and frequency, and demand.

You can select other configuration pages by clicking the desired page in the
tree, or by clicking the corresponding tab in the page.

2.

To change the basic metering setup, enter the desired values into the text
boxes, scroll down, and click Apply Changes.

A dialog box appears to report the result of the setup change.

Advertising