Viewing asset usage reports – H3C Technologies H3C Intelligent Management Center User Manual

Page 297

Advertising
background image

281

4.

Select an operator group that can view the report. When you select an operator group, all

operators that belong to the group can view the report.
To view the operators who belongs to an operator group:

a.

Click the Operator Group Information icon

to the right of Access Right, and the Operator

Group Information page appears.

a.

Select one or more operator groups in the Group Name area.
The operators that belongs to the selected operator groups are displayed.

b.

Click Close to return to the page for adding a report.

5.

Specify the period for which a report will be generated.
A scheduled report period is determined by both the schedule type and schedule time settings.

{

Schedule Type—Select one of the following scheduling options: Daily, Weekly, Monthly,
Quarterly, Half Yearly, and Yearly.

{

Report Start Date—Click the field to select the start date in a calendar.

6.

Set the time when a report becomes invalid and the EAD component no longer generates the
report.
Click the End by box. Enter an end time in the format YYYY-MM-DD hh:mm. You can also click the
field to select the end time in a calendar.

7.

From the Report File Format list, select a report file format.
Options are PDF, CSV, MSExcel, and MSExcel (Data-only).

8.

Send a report by email.
Click the Send by Email box, and enter the email address of the receiver. Reports can be sent to
one email address.

9.

Set the asset idle period.
The asset usage report collects statistics about assets which have been offline for more than the
specified number of days.

a.

Click the Set Parameter icon

to set the idle period.

b.

In the Parameter Value field, enter the minimum number of idle days.

c.

Click OK to return to the page for adding a report.
The Set Parameter icon changes from

to .

10.

Click OK.

Viewing asset usage reports

1.

Click the Report tab.

2.

From the navigation tree, select Scheduled Reports > All Scheduled Reports.
The All Scheduled Reports page appears.

3.

Click the History Report icon

for the asset usage reports.

The History Report page appears.

4.

Click the View link to open a statistics report, or save the statistics report (see

Figure 55

).

Advertising