6 commissioning, 1 before initial switch-on, Commissioning – Lenze E94AYCCA User Manual

Page 32: Before initial switch-on

Advertising
background image

E94AYCCA communication manual (CANopen®)

Commissioning

Before initial switch-on

32

L

EDS94AYCCA EN 5.0 - 06/2012

6

Commissioning

During commissioning, the controller receives system-specific data, e.g. motor

parameters, operating parameters, responses, and parameters for the fieldbus

communication. In case of Lenze devices, this is done via codes.
The codes for the controller and for the communication are saved as a non-volatile data set

in the memory module.
In addition to codes for the configuration, there are codes for diagnosing and monitoring

the nodes.

6.1

Before initial switch-on

Note!

When parameterising the communication module, please note that the code

number depends on the slot of the Servo Drive 9400 which the communication

module is plugged into.
The first two digits of the code number indicate the slot:
• C13nnn for slot MXI1



Parameters of the communication module for slot MXI1

( 107)

• C14nnn for slot MXI2



Parameters of the communication module for slot MXI2

( 128)

Furthermore, the

Communication-relevant parameters of the standard device

( 101)

must be set.

Stop!

Before switching on the controller for the first time, check ...
• the entire wiring with regard to completeness, earth fault and short circuit.
• whether the bus system is terminated by a bus terminating resistor at the

physically first and last node.



System bus (CANopen) connection

( 26)

Advertising