Rockwell Automation 1752-L24BBBE SmartGuard 600 Controllers User Manual User Manual

Page 35

Advertising
background image

Rockwell Automation Publication 1752-UM001E-EN-P - June 2014

35

Installing and Wiring the SmartGuard 600 Controller

Chapter 2

When safety devices are connected via test outputs to an input circuit on the
SmartGuard controller, we recommend the length of the wire to be 30 m (98.4 ft)
or less.

Figure 6 - Input Devices with Mechanical Contact Outputs

Devices, such as light curtains, with current-sourcing PNP semiconductor
outputs send a signal to the SmartGuard 600 controller safety input terminal and
do not use a test output.

IN0…IN15

Terminals for safety inputs.

T0…T3

These are test output terminals that can provide pulse test sources for safety inputs
IN0…IN15. T3 can also support wire off detection and burned out bulb detection for a
load such as a muting lamp.

OUT0…OUT7

Terminals for safety outputs.

ATTENTION: If you connect or disconnect wiring while the field-side power is
applied, an electrical arc can occur. This could cause an explosion in hazardous
location installations. Be sure that power is removed or the area is
nonhazardous before proceeding.

ATTENTION: If you connect or disconnect the removable terminal block (RTB)
while the field-side power is applied, an electrical arc can occur. This could
cause an explosion in hazardous location installations. Be sure that power is
removed or the area is nonhazardous before proceeding.

IMPORTANT

Prepare stranded wires by attaching ferrules with plastic insulation covers
(compliant with the DIN 46228-4 standard). Ferrules similar in appearance but
not compliant may not match the terminal block on the controller.

SmartGuard 600
Controller

V1

Tx

INx

G1

24V dc

4.5 mA Typical

Advertising
This manual is related to the following products: