Bio-Rad Profinia™ Protein Purification Instrument User Manual

Page 151

Advertising
background image

13.2 Maintenance

Regular maintenance helps keep the system performing optimally. Figure 13.1 is a diagram
of the instrument’s main parts and connections.

Fig. 13.1. Schematic diagram of the Profinia system.

The following internal components require regular maintenance and may need to be
repaired or replaced occasionally (for a checklist of annual maintenance procedures, see
Appendix G):

Pump check valves

Pump seals

UV monitor lamp

UV monitor flow cells

Buffer and sample inlet tubes

Tubing and fittings

Inline filter

144

Advertising