Optimize_hold_timing – Altera Quartus II Settings File User Manual

Page 653

Advertising
background image

OPTIMIZE_HOLD_TIMING

Allows the Fitter to optimize hold time by adding delay to the appropriate paths. The Optimize Timing

option must be turned on in order for this option to work. If you are using the TimeQuest Timing

Analyzer, and specify the I/O paths and Minimum tpd Paths setting, all assignments involving I/O pins

are optimized. Specifying the All Paths setting directs the Fitter to optimize the hold time of all paths.

Turning off this option directs the Fitter not to optimize the hold time of any paths.

Type

Enumeration

Values

• All Paths

• IO Paths and Minimum TPD Paths

• Off

Device Support

This setting can be used in projects targeting any Altera device family.

Notes

This assignment is included in the Fitter report.

Syntax

set_global_assignment -name OPTIMIZE_HOLD_TIMING <value>

MNL-Q21005

2015.05.04

OPTIMIZE_HOLD_TIMING

653

Quartus Settings File Reference Manual

Altera Corporation

Send Feedback

Advertising