Basics for wiring according to EMC
Motor cable

5.3
5.3.3

l

5.3−2

EDSVF9383V EN 7.1−04/2012

5.3.3

Motor cable

ƒ Use only shielded motor cables with braid made of tinned or

nickel−plated copper. Shields made of steel braid are not suitable.
– The overlap rate of the braid must be at least 70 % with an overlap

angle of 90 °.

ƒ The cables used must meet the requirements of the application (e.g.

EN 60204−1).

ƒ The cable for the motor temperature monitoring (PTC or thermal

contact) must be shielded and separated from the motor cable.
– With Lenze system cables, the cable for the motor temperature

monitoring is integrated into the motor cable.

ƒ Always place the shield of the motor cable at both sides − at the drive

controller and at the motor.
– Always connect the shields to the conductive and grounded

mounting plate with a surface as large as possible.

ƒ The motor cable is perfectly installed if

– it is routed separately of mains cables and control cables,
– crosses mains cables and control cables only at a right angle,
– is not interrupted.

ƒ If it is inevitable to have an interruption (e.g. through chokes,

contactors or terminals):
– The unshielded cable must not be longer than 100 mm (depending

on the cable cross−section).

– Chokes, contactors, terminals, etc. must be separated from other

components (min. distance = 100 mm).

– The motor cable shield must be connected to the mounting plate

with a surface as large as possible directly before and after the point
of interruption.

ƒ Connect the shield in the motor terminal box or at the motor housing

to PE with a surface as large as possible.
– Metal cable glands at the motor terminal box ensure that the shield

is connected to the motor housing with a surface as large as possible.