Conduct a test switchover, Click the synchronization tab, Click initiate switchover – Rockwell Automation 1756-RMxx ControlLogix Enhanced Redundancy System User Manual User Manual

Page 195: Click yes

Advertising
background image

Rockwell Automation Publication 1756-UM535D-EN-P - November 2012

195

Monitor and Maintain an Enhanced Redundancy System

Chapter 8

Conduct a Test Switchover

Complete these steps to verify that your redundant system switches over as

expected. Your system must be fully-qualified before you begin.

1. In RSLinx Classic software, access the RMCT for the primary

redundancy module.

2. Click the Synchronization tab.

3. Click Initiate Switchover.

The Redundancy Configuration Tool dialog box opens.

4. Click Yes.

The switchover begins.

5. View your HMI or other status-monitoring device to verify that the

switchover was successful.

Advertising