I.16. installing the ch. 5-8 mic pre board – Metric Halo Mobile I/O User Manual

Page 350

Advertising
background image

ULN-R Installation Guide

350

Figure I.16: Installing the Ch. 5-8 Mic Pre Board

The installation is finished! Replace the top cover, and replace the six crews on the top of the case. Then replace
the screws on the left and right side, remembering to use the longer screws on the rack ears. It sometimes helps
to squeeze the top and bottom of the case together when replacing the side screws, to ensure that the outer
holes line up with the threaded inserts.

Once you have reassembled the unit, connect it to your computer and power it up. When looking at an Analog
input in MIO Console, you will now have the “Mic” and “Mic S/R” selections as input choices, as well as
phantom power control.

If you have any questions about the installation process, contact [email protected].

Advertising