Uln-8 quick start guide, Prepare the unit for use, Uln-8 – Metric Halo Mobile I/O User Manual

Page 45

Advertising
background image

45

4. ULN-8 Quick Start Guide

Figure 4.1: ULN-8

Prepare the unit for use

Unpack the ULN-8 and make sure all the parts are there:

• One ULN-8 unit
• One IEC Power Cord appropriate for your area
• One 24-volt 48-watt world-ready external power supply
• One 30” IEEE 1394 9-pin to 6-pin FireWire Cable
• One 4.5 meter IEEE 1394 9-pin to 6-pin FireWire Cable
• Two Rack Ears w/ fasteners
• Rubber feet
• Configuration jumpers
• MIO Software CD-ROM
• Warranty/Registration Card

Bask in the look and feel of the ULN-8! Once you’re finished, connect the power supply. Now connect your
input and output cables along with your monitors and signal sources. Your monitors should be connected to
Analog Out 1/2, either via a DB25 cable or the 1/4" TRS jacks. Turn the unit on using the front panel switch.
Cool, isn’t it?

Advertising