Running a TIM
sequence

1.

Select sequence,

see "Select sequence", page 204

.

2.

If Question marks "?" are present in the Electrode and/or Reagent
tabs, it means that the method needs to be programmed - an
electrode and/or a reagent is missing. Review programming in
Supervisor mode.

Refer to "Programming sequence", page 159

.

3.

Connect/calibrate the electrode(s).

Refer to "Electrode connection", page 102

.

Refer to "Electrode calibration", page 98

.

4.

Install/calibrate reagent(s).

Refer to "Install reagent", page 126

.

Refer to "Reagent calibration", page 168

.

5.

Prepare the sample stack.

Refer to "Sample stack", page 202

.

6.

When Sunny icons are visible in the Electrode and Reagent tabs:
- Press 1 in the Main window to run the sequence from the first
beaker of the sample stack,
- To run a sequence from a given beaker number of the sequence,
press 2 in the Main window and 4 Start from...

If you have a problem running the analysis, the Titration
Manager will guide you through the necessary operations so
that you are able to run the analysis in no time at all.

For the following steps:

Refer to "Run window", page 191

.

Running an
electrode
calibration
sequence

Refer to "Electrode calibration (SAC sequence)", page 99

.

Use the Left/Right arrow keys to select the

beaker you want to start the sequence then

press 1 Start from...

Limitations: you can only start a sequence:

- from the first beaker of an electrode or reagent
calibration,
- or when several replicates (tests) are edited
for a same sample, from the first beaker of that
sample.