Initial Power-up

1. Verify the AC power is within specifications at the terminal strip.

2. Switch the AC Power to ON and verify the Status LED is green

3. Switch the power OFF and wait until the DC Bus Voltage is below

30 Volts.

4. Connect the motor windings to:

• R (TB1-6)for the Phase R winding

• S (TB1-7) for the Phase S winding

• T (TB1-8) for the Phase T winding

(TB1-9) for the Ground connection.

5. If a brake motor is being used for the test, connect the brake relay:

• BRAKE ENABLE + (J1-49) to the Motor Brake +

• BRAKE ENABLE - (J1-50) to the Motor Brake -.

6. Switch AC Power ON again and verify the STATUS LED is green

7. Switch the power OFF and wait until the DC Bus Voltage is below

30 Volts.

Communications Verification

8. Start ULTRA Master on the PC.

9. Close any windows that are open in ULTRA Master.

10. Select

P

C Set Up

from the Communications menu in

ULTRA Master.

11. Verify the communication port settings match those of the drive,

then select

OK

. Factory default drive settings are:

• Baud Rate:

9600

• Data Bits:

8

• Parity:

None

• Stop Bits:

1

• Serial Port:

COM1

Assignment of communications ports on PCs varies between
manufacturers. The COM port setting for the drive and PC must
match. Refer to “Troubleshooting” on page 11-3 if
communication problems are encountered.

12. Switch AC power ON.