Super Systems PC Configurator 2 User Manual

Page 73

Advertising
background image

Super Systems Inc.

Page 73 of 201

Configurator Manual #4562 Rev D

When a probe is in a furnace, soot will collect in the end of the probe, which will have a
negative effect on the performance of the probe. Burnoffs are used to clean out the built-up
carbon by burning it off of the probe.

Burnoff:
Clicking on this value allows users to manually initiate burnoff procedure. The user will have to
confirm this action

Configurator – Confirm burnoff


The “Test Status” will show that a burnoff is in progress.

Impedance Test:
Clicking on this value manually turns on/off the impedance test (this can

only

be initiated

manually). This test lasts 30 seconds. The user will have to confirm the action.

Configurator – Confirm impedance test


The “Test Status” will then become “Impedance Test”.

Cancel:
Clicking on this value will manually turn off both the burnoff and the impedance test. The user
will have to confirm this action.

Configurator – Confirm cancellation


Next Burnoff: (shown in minutes):
This value is a displayed calculation based on the burnoff time set in the

Probe Burnoff Setup

menu option. It displays the number of minutes until the next burnoff will be initiated.

Test Status:
This value displays the current testing status. The list of possible values are: Burnoff, Burnoff
Recovery
, Idle, Impedance Recovery, or Impedance

Timer:

Advertising