Chapter 31, Press, Or press – Rockwell Automation 8520-MUM 9/Series CNC Mill Operation and Programming Manual Documentation Set User Manual

Page 821

Advertising
background image

Using Transfer Line Cycles

Chapter 31

31-19

3.

Press

[F3]

to pull down the Application menu.

The workstation displays this screen:

F1 - File

F2 - Project

F3 - Application

F4 - Utility

F5 - Configuration

Proj: TRAN230

Appl: Upload

Util: Get PAL I/O

AMP
PAL
I/O Assignments
Part Program
Upload
Download

(A)
(P)
(I)
(R)
(U)
(D)

4.

Use the arrow keys to highlight the Download application then press

[ENTER]

or press

[D].

5.

Press

[F4]

to pull down the Utility menu.

F1 - File

F2 - Project

F3 - Application

F4 - Utility

F5 - Configuration

Proj:TRAN230

Appl: Download

Util: Get PAL I/O

Send AMP params
Send PAL and I/O
Send Part Program

(A)
(P)
(R)

Advertising