Chapter 2: routine inspection, 1 routine inspection, 2 battery – Yaskawa YASNAC PC NC Maintenance Manual User Manual
Page 14
Chapter 2: Routine Inspection
PC NC Maintenance Manual
2-1
Chapter 2: Routine Inspection
This chapter includes the requirements to maintain optimum operating conditions over
time.
2.1 Routine Inspection
The table below details routine inspection of the PC NC.
* With the exception of inspections made while the NC is in the energized state (i.e., external cleanliness,
vibration, noise, etc.), turn off the source power supply to the NC before undertaking routine maintenance
service. To remove power completely from the NC, turn off the main circuit breaker on the power panel
of the machine.
2.2 Battery
To determine whether the battery must be replaced, and replacement directions,
follow the steps below.
1. Press the Power OFF button.
Table 2.1: Routine Inspection
Area
Inspect Item
Frequency
System
OFF/ON*
Remarks
Battery
Verify battery alarm
LED is on.
At power on
ON
If alarm LED is on, replace battery.
Servo motor
Vibration and noise Daily
ON
Feel by hand; listen by ear.
Motor contamina-
tion and damage
Daily (or as
required)
ON and OFF
Visual inspection
Fan
Air flow
Monthly
ON and OFF
Feel by hand; listen by ear.
Touch screen
Clean
Daily
ON and OFF
Use clean rag.
Calibrate
Monthly
ON
Use Calibration Screen.
Control panel
Verify doors are
tightly closed.
Daily
OFF
Visual inspection
Verify tight fit, no
gaps in the side
plates, and door
gaskets are not
worn.
Monthly
OFF
Visual inspection