Chapter 2: routine inspection, 1 routine inspection, 2 battery – Yaskawa YASNAC PC NC Maintenance Manual User Manual

Page 14

Advertising
background image

Chapter 2: Routine Inspection

PC NC Maintenance Manual

2-1

Chapter 2: Routine Inspection

This chapter includes the requirements to maintain optimum operating conditions over

time.

2.1 Routine Inspection

The table below details routine inspection of the PC NC.

* With the exception of inspections made while the NC is in the energized state (i.e., external cleanliness,

vibration, noise, etc.), turn off the source power supply to the NC before undertaking routine maintenance
service. To remove power completely from the NC, turn off the main circuit breaker on the power panel
of the machine.

2.2 Battery

To determine whether the battery must be replaced, and replacement directions,
follow the steps below.

1. Press the Power OFF button.

Table 2.1: Routine Inspection

Area

Inspect Item

Frequency

System

OFF/ON*

Remarks

Battery

Verify battery alarm
LED is on.

At power on

ON

If alarm LED is on, replace battery.

Servo motor

Vibration and noise Daily

ON

Feel by hand; listen by ear.

Motor contamina-
tion and damage

Daily (or as
required)

ON and OFF

Visual inspection

Fan

Air flow

Monthly

ON and OFF

Feel by hand; listen by ear.

Touch screen

Clean

Daily

ON and OFF

Use clean rag.

Calibrate

Monthly

ON

Use Calibration Screen.

Control panel

Verify doors are
tightly closed.

Daily

OFF

Visual inspection

Verify tight fit, no
gaps in the side
plates, and door
gaskets are not
worn.

Monthly

OFF

Visual inspection

Advertising