Individual unit power-up verifications, Individual unit power-up verifications -12 – Rockwell Automation 2364F Regenerative DC Bus Supply Unit (RGU) User Manual

Page 82

Advertising
background image

Publication 2364F-5.01– October 2003

7-12

Installing Your RGU

Individual Unit Power-Up
Verifications

1. Verify that the RGU start switch is in the off position.

2. Verify that the incoming phase-to-phase line voltages are within

these tolerances (on the line side of the breaker/motor circuit
protector):

!

ATTENTION: Do not proceed if the RGU fails any of
the checks described in this section. Failure to do so may
result in personal injury and/or equipment damage.

ATTENTION: Perform these verifications for each
RGU in your drive system before connecting the
RGU(s) to the drive lineup.

ATTENTION: The RGU supplies power to the DC
bus whenever the disconnect is closed.

ATTENTION: This unit contains stored energy
devices. To avoid the hazard of electrical shock, verify
that all voltage on capacitors has been discharged before
attempting to service, repair, or remove a drive system
or its components.

ATTENTION: The procedures in this manual should
be performed by qualified personnel who are familiar
with solid-state control equipment and with the safety
procedures in publication NFPA 70E.

Nominal AC Input Voltage

(V AC)

Minimum AC Input Voltage

(V AC)

Maximum AC Input

Voltage (V AC)

380

342

418

460

414

506

575

518

632

Advertising