1 overview, 2 machine switch-on, Overview – HEIDENHAIN TNC 620 (81760x-02) ISO programming User Manual

Page 48: Machine switch-on

Advertising
background image

First steps with the TNC 620

1.1

Overview

1

48

TNC 620 | User's ManualDIN/ISO Programming | 2/2015

1.1

Overview

This chapter is intended to help TNC beginners quickly learn to

handle the most important procedures. For more information on a

respective topic, see the section referred to in the text.
The following topics are included in this chapter:

Machine switch-on
Programming the first part
Graphically testing the first part
Setting up tools
Workpiece setup
Running the first program

1.2

Machine switch-on

Acknowledging the power interruption and moving
to the reference points

Switch-on and crossing over the reference points can

vary depending on the machine tool. Refer to your

machine manual.

Switch on the power supply for control and machine. The TNC

starts the operating system. This process may take several

minutes. Then the TNC will display the "Power interrupted"

message in the screen header.

Press the CE key: The TNC compiles the PLC

program

Switch on the control voltage: The TNC checks

operation of the emergency stop circuit and goes

into the reference run mode
Cross the reference points manually in the

displayed sequence: For each axis press the
machine

START button. If you have absolute linear

and angle encoders on your machine there is no

need for a reference run

The TNC is now ready for operation in the

Manual Operation

mode.

Further information on this topic

Traversing the reference marks: see "Switch-on", page 430
Operating modes: see "Programming", page 72

Advertising