Test Run with Load Connected

u

Test Run with the Load Connected

After performing a no-load test run connect the load and proceed to run the motor and load

together.

n

Notes on Connected Machinery

• Clear the area around the motor.
• The motor should come to a complete stop without problems.
• Connect the machinery.
• Fasten all installation screws properly. Check that the motor and connected machinery are

held in place.

• Confirm that the Fast-stop circuit or mechanical safety measures operate correctly.
• Be ready to press the STOP button in case of emergency.

n

Checklist Before Operation

• The motor should rotate in the proper direction.
• The motor should accelerate and decelerate smoothly.

n

Operating the Motor under Loaded Conditions

Test run the application similarly to the no-load test procedure when connecting the machinery

to the motor.
• Check monitor parameter U1-03 to ensure there is no overcurrent.
• If the application permits running the load in the reverse direction, try changing motor

direction and the frequency reference while watching for abnormal motor oscillation or

vibration.

• Correct any problems that occurs with hunting, oscillation, or other control-related

issues.

4.8 Test Run with Load Connected

116