4 system validation – Metrohm 840 PC Control 5.0 / Touch Control User Manual

Page 102

Advertising
background image

3.12 GLP manager

90

PC Control / Touch Control

Open the dialog GLP test measurement/Test interval or GLP

test titration/Test interval.

Activate the Monitoring checkbox.

Enter either the GLP test interval or the date for the Next GLP

test. If the time interval or date is edited then the other parameter

will be updated automatically.

Select an Action to be carried out when the time interval has

expired.

The GLP test interval will always be monitored at the START of a

determination.

3.12.4 System validation

You can document the System validation results here and also define

the time interval after which validation must be carried out again.

To document the results of a system validation open the dialog GLP

manager/System validation.

You can select or enter the Method used for the system validation.

Only methods in the internal memory will be shown in the selection

list. You can also enter or select the User who carried out the

validation from the selection list.

Enter the Test date for the last validation and select the Test

result.

You can enter a Comment for each test.

Open the dialog System validation/Test statistics. You can

document the statistical data for the last system validation here.

Please consult the online help for a description of the individual

parameters.

You can monitor the time interval after which a system validation

must be carried out again. (A detailed description of the monitoring

function using "Titer validity" as an example can be found in

Section 3.8.4.)

Open the dialog System validation/Validation interval.

Activate the Monitoring checkbox.

Advertising