Titration sequence for det and met – Metrohm 840 PC Control 5.0 / Touch Control User Manual

Page 217

Advertising
background image

4

Parameters

PC Control / Touch Control

205

The parameters for Control device, Sensor, Dosing device and

Stirrer

are described in Section 4.1.5.

Titration sequence for DET and MET

Start of titration

command

(Switch on stirrer) The stirrer is switched on after the start.

Measure initial

measured value

The initial measured value is measured.

(Start conditions:

start volume

start meas. value

start slope

pause)

The start volume is added with the start conditions

being processed in succession. No measuring

points are entered in the list of measuring points.

The pause interval is allowed to elapse.

Titration:

add increments

accept measured

values

Volume increments are added during the titration

and a measuring point is entered on the list of

measuring points after each increment. Measured

value acceptance is either drift-controlled (equilib-

rium titration) or a fixed waiting time is allowed to

elapse. The first criterion to be fulfilled applies.

Stop conditions

The first criterion to be fulfilled applies for stopping

the titration.

(Switch off stirrer) The stirrer is switched off.

Fill dosing

cylinder

After the end of the titration the dosing cylinder is

refilled automatically.

Optional steps are shown in brackets.

Advertising