8 monitoring the glp test, 9 monitoring the working life – Metrohm 840 PC Control 5.0 / Touch Control User Manual

Page 61

Advertising
background image

3

Operation

PC Control / Touch Control

49

3.8.8 Monitoring the GLP test

You can monitor the time interval after which a GLP test must be

carried out again for the exchange or dosing unit. (A detailed

description of the monitoring function using "Titer validity" as an

example can be found in Section 3.8.4.)

Open the dialog Exchange unit/GLP test or Dosing unit/GLP

test. Enter the date of the last GLP test to have been carried out

and activate the Monitoring checkbox.

Enter either the GLP test interval or the date of the next GLP

test. If the time interval or date is altered then the other parameter

will be updated automatically.

Select an Action to be taken when the time interval has expired.

3.8.9 Monitoring the working life

You can monitor the time interval after which the reagent must be

replaced. This is a very good idea when your reagent has a limited

working life. (A detailed description of the monitoring function using

"Titer validity" as an example can be found in Section 3.8.4.) For

documentation purposes you can enter the preparation date without

monitoring the time interval.

Open the dialog Edit titrant/Working life. Enter Preparation

date for the reagent or the date on which the bottle was opened

and activate the Monitoring checkbox.

Enter either the Working life or Expiry date of the reagent. If the

time interval or date is altered then the other parameter will be

updated automatically.

Select an Action to be taken when the working life has expired.

Advertising