Reloading controllers – Rockwell Automation 1757-SWKIT5000 ProcessLogix R500.1 Installation and Upgrade Guide User Manual
Page 124
![background image](/manuals/579176/124/background.png)
Publication 1757-IN500A-EN-P - September 2002
4-36 ProcessLogix Server Upgrade Procedures
Reloading Controllers
1. In the Project tab, confirm that the components of your configured
control strategy are listed in the Root directory.
2. Download each CPM and SRM to its given Controller.
3. Download the database (contents of each CPM’s CEE) to the
Controller.
4. In the Monitoring tab, activate the CEE and all of its components in a
given Controller.
5. Close Control Builder.
Backing Up a ProcessLogix Server Hard Drive to Tape
Performing backups is an essential part of maintaining your system. You
should back up all the files under the data directory, as well as any user files you
create. Refer to Backing Up a ProcessLogix R500.1 Server to Tape on
page 8-7.