Rockwell Automation 1757-SWKIT5000 ProcessLogix R500.1 Installation and Upgrade Guide User Manual
Page 243
Advertising
Publication 1757-IN500A-EN-P - September 2002
Performance and Capacity Specifications 11-3
includes active monitoring from multiple Stations with or without multiple
locations and random report generation.
Table 11.A Database Sizing Chart
Process Configuration
System Suggestion
Controllers: None
Up to 3,000 SCADA points
Minimum
Up to 6 Controllers
(1)
Systems with up to 600 CM/SCM/IOM/1757-FIM
Up to 10,000 SCADA points
(1)
Hybrid Controllers configured in a redundant mode should be counted as 1 Hybrid Controller.
Typical
More than 6 Controllers
(1)
Systems with more than 600 CM/SCM/IOM/1757-FIM
More than 10,000 SCADA points.
Performance
Advertising