Rockwell Automation 1757-SWKIT5000 ProcessLogix R500.1 Installation and Upgrade Guide User Manual
Page 155
Publication 1757-IN500A-EN-P - September 2002
ProcessLogix Client Installation and Upgrade Procedures 5-31
• C:\honeywell\client\dspbld
18. Click Save.
19. Click Yes to save changes.
20. Highlight Default and click Connect.
21. Click Cancel at the Unable to connect prompt, if applicable.
22. If you have redundant LANs, you must repeat Step 3 through Step 21 to
set up files for the second LAN using the name or IP address of the
SERVERA and SERVERB nodes specified in the Hosts file for the
second LAN
.
Navigate in Knowledge Builder to Server and Client Configuration
Guide
⇒
Configuring and Monitoring a Redundant Server System
⇒
Configuring
Stations for Server Redundancy
⇒
Dual Network Configuration for more
information.
IMPORTANT
Display Search Path Optimization
You can improve Station’s performance by unchecking the
Search subdirectories for shapes option in the Connection
Properties dialog box, and then explicitly defining each
subdirectory that contains displays.