Completing the Installation

8-1

C

HAPTER

8

Completing the Installation

This chapter provides instructions on how to perform a final check of
the installation before power is applied to the drive.

8.1

Checking the Installation

To verify the condition of the installation:

Step 1.

Turn off, lock out, and tag the input power to the drive.
Wait five minutes.

Step 2.

Verify that the DC bus voltage is zero. See section 13.1.

Step 3.

If a function loss coast-stop pushbutton has been
installed, verify that it has been wired correctly.

Step 4.

Remove any debris, such as metal shavings, from around
the drive.

Step 5.

Check that there is adequate clearance around the drive.

Step 6.

Verify that there is nothing mounted behind the drive.

!

ATTENTION: Only qualified electrical personnel familiar with
the construction and operation of this equipment and the
hazards involved should start and adjust it. Read and
understand this manual in its entirety before proceeding.
Failure to observe this precaution could result in severe bodily
injury or loss of life.

!

ATTENTION: DC bus capacitors retain hazardous voltages
after input power has been disconnected. After disconnecting
input power, wait five minutes for the DC bus capacitors to
discharge and then check the voltage with a voltmeter to
ensure the DC bus capacitors are discharged before touching
any internal components. Failure to observe this precaution
could result in severe bodily injury or loss of life.

ATTENTION: You must provide an external, hardwired
emergency stop circuit outside of the drive circuitry. This circuit
must disable the system in case of improper operation.
Uncontrolled machine operation can result if this procedure is
not followed. Failure to observe this precaution could result in
bodily injury.