3 confirming the operational state of atm line, 3 confirming the operational state of atm line -6 – Hitachi GR2000 Series User Manual

Page 106

Advertising
background image

Hitachi Gigabit Router GR2000 Series Enhanced Version Operations - Device Management Overview

5-6

GR2K-GA-0015

Ver. 07-02

5.1.3

Confirming the operational state of ATM line

When ATM line is used in connecting a line from the router to a network, confirm the
operational state with the procedure below. See Subsection 7.4.3, “ATM line cannot
be connected”
for measures to be taken when the operational state is abnormal.

1. Execute a show interfaces command and confirm that the display in display item

<NIF state> is "active" (in normal operation) and that the display in <Line state>
is "active up" (in normal operation).

Figure 5-10 Example of display of NIF/Line state

2. Execute a show atm command and confirm that the display in display item <VC

state> is "up" (in normal operation).

Figure 5-11 Example of display of VC state

3. When the remote router of VC supports an F5 OAM loop-back cell, execute a ping

atm command and confirm whether the communication between relevant VCs
can be performed ("Received" is displayed).

Figure 5-12 Example of display of OAM F5 loopback cell response

> show interfaces nif 0 line 0

2000/04/02 12:00:00

NIF0: active 1-port OC-3c/STM-1 ATM(multi-mode) retry:0

Line0: active up OC-3c/STM-1 ATM(multi-mode)

Time-since-last-status-change:1:30:30

[Omitted hereinafter.]

>

> show atm nif 0 line 0 vpi 0 vci 32

2000/04/02 12:00:00

NIF0: active 1-port OC-3c/STM-1 ATM(multi-mode) retry:0

Line0: active up OC-3c/STM-1 ATM(multi-mode)

[Omitted halfway]

VPI0: PCR(VP Shaper) 10000kbps

VPI0/VCI32: up PVC ALARM

[Omitted hereinafter.]

>

> ping atm nif 0 line 0 vpivci 0 32

Data Received OAM-seq=0

Data Received OAM-seq=1

Data Received OAM-seq=2

Data Received OAM-seq=3

Data Received OAM-seq=4

>

Advertising