Chapter 8 maintenance procedure, Chapter 8 - maintenance procedure -1 – Hitachi GR2000 Series User Manual

Page 263

Advertising
background image

GR2K-GA-0015

8-1

Ver. 07-02

Chapter 8

Maintenance Procedure

This chapter describes the work procedure relevant to the maintenance work. The
major sections are as follows:

Section 8.1, “Acquisition of failure information” on page 8-2,

Section 8.2, “Transmission of Maintenance Information” on page 8-3,

Section 8.3, “Swapping of Boards in Failure” on page 8-9,

Section 8.4, “Removal/Addition of Boards and Physical Memory” on page 8-21,

Section 8.5, “Removing and Inserting of MC” on page 8-32,

Section 8.6, “Status Assurances on BCU/RP/NIF and Lines” on page 8-33,

Section 8.7, “Line Test” on page 8-37.

Unless otherwise specified, commands discussed in this chapter are fully
documented in GR2000 Operations Commands, Vol. 1 or GR2000 Operations
Commands, Vol. 2.

Advertising