Figure 15-16 – INFICON HAPSITE ER Chemical Identification System User Manual

Page 466

Advertising
background image

15 - 14

IP

N 07

4-

47

1-

P1

B

HAPSITE ER Operating Manual

Figure 15-16 Attach Confirmation Request

5

The Roughing Pump will start first, then the Turbo Pump will begin to speed up,
as shown on the Turbo Speed (Hz) line in

Figure 15-15

above. (The speed is

initially listed as 0.)

NOTE: The Attach procedure typically takes about 5 minutes to complete.

After selecting the Attach button, the HAPSITE Properties window can be
closed at any time.

While attaching, the following prompt will appear.

Figure 15-17 Attach In Process

6

When the Attach procedure is finished, the following message will be displayed
on the screen.

Figure 15-18 Attach Successful

15.7.2 Attaching the HAPSITE to the Service Module using the HAPSITE

Front Panel Controls

1

To avoid running the start up method or AutoTune, touch STOP PREPARE.
See

Figure 15-19

.

Advertising