Figure 15-16 – INFICON HAPSITE ER Chemical Identification System User Manual
Page 466
15 - 14
IP
N 07
4-
47
1-
P1
B
HAPSITE ER Operating Manual
Figure 15-16 Attach Confirmation Request
5
The Roughing Pump will start first, then the Turbo Pump will begin to speed up,
as shown on the Turbo Speed (Hz) line in
Figure 15-15
above. (The speed is
initially listed as 0.)
NOTE: The Attach procedure typically takes about 5 minutes to complete.
After selecting the Attach button, the HAPSITE Properties window can be
closed at any time.
While attaching, the following prompt will appear.
Figure 15-17 Attach In Process
6
When the Attach procedure is finished, the following message will be displayed
on the screen.
Figure 15-18 Attach Successful
15.7.2 Attaching the HAPSITE to the Service Module using the HAPSITE
Front Panel Controls
1
To avoid running the start up method or AutoTune, touch STOP PREPARE.
See