Figure 4-35. S#-79SCB=1/2/3/4/5 Logic Timing Diagram

Figure 4-36. S#-79SCB=2/3/4/5 Logic Timing Diagram

Zone-Sequence Coordination

To coordinate tripping and reclosing sequences with downstream protective relays and reclosers, the

BE1-851 senses fault current from downstream faults when a user programmable logic, set by the SP-

79ZONE command, picks up and then drops out without a trip output (defined with the SG-TRIGGER

command) occurring. Typically, the low-set instantaneous pickup outputs (50TPPU and 50TNPU) or the

time overcurrent pickup outputs (51PPU and 51NPU) are used for the zone sequence settings (SP-

79ZONE=50TPPU+50TNPU or SP79ZONE=51PPU+51NPU).
If the upstream relay (BE1-851) senses that a downstream device has interrupted fault current, the BE1-

851 will increment the trip/reclose sequence by one operation. This occurs because the BE1-851

recognizes that a non-blocked low set (50TP or 50TN) element picked up and reset before timing out to

trip.
BESTlogic settings are made from the BESTlogic Function Element screen in BESTCOMS. Figure 4-37

illustrates the BESTCOMS screen used to select Zone Sequence Coordination Logic settings for the

reclosing element. To open the BESTlogic Function Element screen for Reclosing (Zone Sequence

Logic), select Reclosing from the Screens pull-down menu and click on the Logic button next to Zone

Sequence Logic in the lower right corner of the screen. Alternately, settings may be made using the SP-

79ZONE ASCII command.