Preparing to use video probes, Establishing the measurement reference – HEIDENHAIN IK 5494-2D User Manual

Page 161

Advertising
background image

5

Measuring

139

Preparing to use video probes

The system stage and optical system must be well-maintained, free of scratches and other damage and

clean. The optical magnification and part lighting must be prepared as described in Chapter 4: Probes

Chapter 4: Probes.

Establishing the measurement reference

A reliable measurement reference must be established before part features can be probed and measured.

This reference will be created by the user and will ensure:

• A level part surface

• Precise part alignment

• An origin or datum zero for the measurement coordinate system

Leveling the part (optional)

When the surface plane of the part is not orthogonal to the measuring axis, small cosine errors can be gen-

erated during the measuring process. These errors can be minimized or eliminated by leveling the part.

CAUTION

This is not required in most well-maintained systems. Additionally, if the depth of

field of the lens system is not much less than the level error, no benefit can be gained

from leveling the part.

To level the part:

1 Click the Datum/Level menu item. A description of the leveling measure-

ment process will be displayed in a prompt window.

2 Perform the leveling measurement by probing 3 or more points that are well

distributed across the surface of the part using the Height probe, and then click

OK in the prompt window.

Three points of the Metronics quickie slide are probed to perform part leveling

The Measurement Process

Advertising