Metrohm tiamo 2.3 Patch 1 (process analysis) User Manual

Page 294

Advertising
background image

4.4 Templates

■■■■■■■■■■■■■■■■■■■■■■

278

■■■■■■■■

tiamo 2.3 Patch 1 (for Process Analysis)

<vs val=""/>

Result status:

OK = The value is ok and has not been monitored.

OKL = The value is ok and has been monitored.

LE = The value has exceeded the limit and has not been
monitored.

LEL = The value has exceeded the limit and has been
monitored.

NV = The value is invalid and has not been monitored.

NVL = The value is invalid and has been monitored.

<vt val=""/>

Result type:

TX = Text

NR = Number

DT = Date/Time

NA = Unknown

<vn val=""/>

Result name.

<pr val=""/>

Name of the CALC command the result has been gener-
ated with.

</data>

– <sme>

Mean value of the result.

– <data>

<vr val="" />

Mean value with the number of decimal places defined
in the CALC command.

<vf val="" />

Mean value with full precision.

<vs val=""/>

Variable status (see above).

</data>

<sme>

– <abs>

Absolute standard deviation of the result.

– <data>

<vr val="" />

Absolute standard deviation with the number of decimal
places defined in the CALC command.

<vf val="" />

Absolute standard deviation with full precision.

<vs val=""/>

Variable status (see above).

</data>

Advertising