3 series start track, Series start track – Metrohm tiamo 2.3 Patch 1 (process analysis) User Manual

Page 451

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

5 Method

tiamo 2.3 Patch 1 (for Process Analysis)

■■■■■■■■

435

Parallel running normal track
If the check box Return immediately in the (see Chapter 5.6.2.3,
page 453)
command is activated, then the corresponding command
will be be highlighted with an arrow (see below). The execution of the
commands in the normal track is started when this track is called, but it
sends an acknowledgement immediately to the track containing the
corresponding (see Chapter 5.6.10.3, page 1279) command. This
means the execution of the calling track will also be continued, i.e. the
two tracks will be executed simultaneously.

Sequential running normal

track

Parallel running normal track

5.5.2.3

Series start track

Subwindow: Method

A series start track is a track that the user can create manually with
Paste

New track... Series start track or with the icon . It starts

with the start command (see Chapter 5.6.2.4, page 454) and finishes
with an end command (see Chapter 5.6.2.8, page 458). Only one series
start track can be inserted per method.

The series start track is executed only once during the run: at the begin-
ning of the first determination of a series and even before the (see Chap-
ter 5.5.2.1, page 433)
. Sample Processors can, for example, be initialized
with it at the beginning of a determination series.

Advertising