Metrohm tiamo 2.3 Patch 1 (process analysis) User Manual

Page 966

Advertising
background image

5.6 Commands

■■■■■■■■■■■■■■■■■■■■■■

950

■■■■■■■■

tiamo 2.3 Patch 1 (for Process Analysis)

Designation

Description

.BLV

Blank value of the sensor used for the command (only
for ISE sensors)

.BP{x}.MEA

Measured value for the break point x (1…9) in the unit
of the measured value

.BP{x}.TEM

Temperature for the break point x (1…9) in °C

.BP{x}.TIM

Time for the break point x (1…9) in s

.BSY

Command status; 1 = BUSY, HOLD or ERROR; 0 =
READY
; invalid (variable not available) = Command
has never been started

.DBL

Total duration for the processing of the command in s

.EME

End measured value (measured value after processing
of the command) in the unit of the measured value

.ENP

Electrode slope of the sensor used for the command (in
mV for ISE sensors)

.ETE

End temperature (temperature following processing of
the command) in °C

.FIN

Command status; 1 = Command has ended at
least once
, 0, invalid (variable not available) = Com-
mand has never ended

.FP{x}.MEA

Measured value for the fixed endpoint x (1…9) in the
unit of the measured value

.FP{x}.TEM

Temperature for the fixed endpoint x (1…9) in °C

.FP{x}.TIM

Time in s until the fixed endpoint x (1…9) is reached

.IME

Initial measured value (measured value before start
conditions are processed) in the unit of the measured
value

.ITE

Initial temperature (temperature before start conditions
are processed) in °C

.LP.CAx

Calculated value x (1…3) for the last measuring point
on the measuring point list

.LP.EXx

External value x (1…3) for the last measuring point on
the measuring point list

.LP.MEA

Measured value for the last measuring point of the
measuring point list in the unit of the measured value

Advertising