3 det upol - start conditions, Start conditions – Metrohm tiamo 2.3 Patch 1 (process analysis) User Manual

Page 564

Advertising
background image

5.6 Commands

■■■■■■■■■■■■■■■■■■■■■■

548

■■■■■■■■

tiamo 2.3 Patch 1 (for Process Analysis)

end of the command. This parameter is displayed only for 751, 785, 798
and 799.

5.6.3.2.5.3

DET Upol - Start conditions

Tab: Method

DET Upol Properties... Start conditions

Command name

Name of the command.

Input

25 characters

The start conditions are processed in the listed sequence before the titra-
tion is started.

Initial measured value

Note

Only displayed for Titrando and 855.

The initial measured value is determined before the other start conditions
are processed. The measured value acceptance depends on the three fol-
lowing parameters:

Measured value drift

Drift for the measured value acceptance during the titration.

Titrando, 855
Range

0.01 ... 99.90 µA/min

Default value

20.00 (slow), 50.00 (optimal), 80.00 (fast) µA/
min

Selection

off

off
Measured value acceptance will take place after the maximum waiting
time has elapsed.

Titrino
Range

0.05 ... 99.90 µA/min

Default value

20.00 (slow), 50.00 (optimal), 80.00 (fast) µA/
min

Selection

off

off
Measured value acceptance will take place after the maximum waiting
time has elapsed.

Advertising