Festo Контроллер позиционирования CPX-CMAX User Manual

Page 28

Advertising
background image

1. CPX terminal configuration and FHPP overview

1−8

Festo P.BE−CPX−CMA X−CONTROL−EN en 0908NH

1.4

Commissioning instructions via the CPX node (fieldbus)

Fundamentally, the CMAX can be completely commissioned in
a controlled manner via the CPX node.

This requires extensive programming of the master system,
however, and suitable measures for monitoring the drive
while the commissioning functions are being executed.

Recommendation:
Carry out commissioning with the FCT.

Tab. 1/2 shows an o verview of the necessary functions with
references to more detailed information.

Function

Description

Topic

see

Entire commisĆ
sioning sequence

For special applications,
commissioning via the CPX
node is possible.

Instructions for commissionĆ
ing and servicing

Appendix A

During the entire
commissioning

Control and monitoring of
CMAX

Control and status bytes

Chapter 2

commissioning
process

CMAX

Diagnosis

Chapter 4

Parametrisation

Reading the detected actual
configuration, writing the
target configuration

Parametrising mode (FPC)

Section 6.2

target configuration,
parametrisation of the apĆ
plication data, etc.

Acyclic parameter jobs

Section 6.3

Commissioning
operations

Execution of commissioning
operations, movement test,

Commissioning mode

Section 2.2.5

operations

operations, movement test,
identification, teaching funcĆ
tions

Commissioning operations

Section 3.2

Tab. 1/2: Information on how to commission via the CPX node

Also follow the instructions in the CMAX system description.

Advertising