1 establish ready status, Establish ready status – Festo Контроллер позиционирования CPX-CMAX User Manual

Page 59

Advertising
background image

2. I/O data and sequence control

2−31

Festo P.BE−CPX−CMA X−CONTROL−EN en 0908NH

2.3.1

Establish ready status

T

Internal conditions

Actions of the user

T1

Drive is switched on.
No error is found.

ć

T2

Load voltage applied.
The higher−order controller is the PLC/fieldbus
master.

Enable drive" = 1
CCON = xxx0.xxx

1

T3

ć

Stop" = 1
CCON = xxx0.xx

11

T4

ć

Stop" = 0
CCON = xxx0.xx

01

T5

ć

Enable drive" = 0
CCON = xxx0.xxx

0

T6

ć

Enable drive" = 0
CCON = xxx0.xxx

0

T7*

Fault recognised.

ć

T8

Reaction to fault completed, drive stopped
(MC = 1).

ć

T9

There is no longer a fault (F2).

Reset fault" = 0

→ 1

CCON = xxx0.

Pxxx

T10

There is no longer a fault (F1).

Reset fault" = 0

→ 1

CCON = xxx0.

Pxx1

T11

Fault still exists.

Reset fault" = 0

→ 1

CCON = xxx0.

Pxx1

Key: P = positive edge, N = negative edge, x = any

Tab. 2/3: Establish transitions to ready status

Advertising