Festo Контроллер позиционирования CPX-CMAX User Manual

Page 319

Advertising
background image

A. Notes on commissioning and service

A−11

Festo P.BE−CPX−CMA X−CONTROL−EN en 0908NH

Commissioning operations (PNU 1192)

The Commissioning operations" parameter controls
important operations of commissioning. Writing the paraĆ
meter triggers complex actions in the controller which are
essential for commissioning.

See section 5.4.16.

The function data reset" (PNU 1192:03) offers the possibility
to reset the controller to delivery status at any point in time.
Resetting deletes the axis data and the identification data. So
you will always need to repeat commissioning and identificaĆ
tion after a reset.

Advertising