MacDon M205 Operators Manual User Manual
Page 192
Advertising
![background image](/manuals/570509/192/background.png)
13. Move float pins from storage location (A) to engaged
position (B).
Figure 4.52: Lift Linkage
14. Start engine and press HEADER DOWN switch (A) on
ground speed lever (GSL) to lower lift arms until the lift
arm lifts away from the linkage at the rear of the lift arm.
Figure 4.53: GSL
15. Attach slow speed transport hitch to the weight box
tongue with drawbar pin. Secure using lynch pin (A).
Attach safety chain (B).
16. Connect hitch harness (C) to electrical socket at front
of weight box.
Figure 4.54: Weight Box
169887
176
Revision A
Advertising