MacDon M205 Operators Manual User Manual

Page 316

Advertising
background image

MAINTENANCE AND SERVICING

1. Remove the five screws (A) securing control panel (B)

to console, remove panel, and store in the tray.

Figure 5.31: Header Control Panel

2. Back off the jam nut (A) and turn nut (B) to either tighten

or loosen the pivot. The nut should be tightened to
snug and then backed off 1/2 turn.

3. Tighten jam nut (A).

4. Check movement of GSL.

Figure 5.32: Header Control Panel

5. Reinstall the control panel (B) with the five screws (A).

Figure 5.33: Header Control Panel

Adjusting Ground Speed Lever (GSL) Fore-Aft Movement

The GSL should remain as positioned by the Operator yet be movable without excessive force. The spring is set at
the factory to 1-1/4 in. (32 mm).

Adjust as follows:

169887

300

Revision A

Advertising