MacDon M205 Operators Manual User Manual
Page 316
Advertising

1. Remove the five screws (A) securing control panel (B)
to console, remove panel, and store in the tray.
Figure 5.31: Header Control Panel
2. Back off the jam nut (A) and turn nut (B) to either tighten
or loosen the pivot. The nut should be tightened to
snug and then backed off 1/2 turn.
3. Tighten jam nut (A).
4. Check movement of GSL.
Figure 5.32: Header Control Panel
5. Reinstall the control panel (B) with the five screws (A).
Figure 5.33: Header Control Panel
Adjusting Ground Speed Lever (GSL) Fore-Aft Movement
The GSL should remain as positioned by the Operator yet be movable without excessive force. The spring is set at
the factory to 1-1/4 in. (32 mm).
Adjust as follows:
169887
300
Revision A
Advertising