MacDon M205 Operators Manual User Manual

Page 205

Advertising
background image

OPERATION

2. Park windrower on level ground.

3. Raise header fully and hold momentarily to allow lift

cylinders to rephase.

Figure 4.75: Ground Speed Lever (GSL)

4. Set header approximately 6 in. (150 mm) off ground

and check that member (A) is against link (B). Note the
high and low end of header.

5. Place wooden blocks under header cutterbar and legs.

Figure 4.76: Lift Linkage

6. Lower header onto blocks so that member (A) lifts off

link (B) on both sides.

7. Stop engine and remove key.

Figure 4.77: Lift Linkage

169887

189

Revision A

Advertising