MacDon M205 Operators Manual User Manual
Page 205
Advertising
2. Park windrower on level ground.
3. Raise header fully and hold momentarily to allow lift
cylinders to rephase.
Figure 4.75: Ground Speed Lever (GSL)
4. Set header approximately 6 in. (150 mm) off ground
and check that member (A) is against link (B). Note the
high and low end of header.
5. Place wooden blocks under header cutterbar and legs.
Figure 4.76: Lift Linkage
6. Lower header onto blocks so that member (A) lifts off
link (B) on both sides.
7. Stop engine and remove key.
Figure 4.77: Lift Linkage
169887
189
Revision A
Advertising