Transferring r400.0 sp2 or r500.1 data to the, R510.0 server -34 – Rockwell Automation 1757-SWKIT5100 ProcessLogix R510.0 Installation and Upgrade Guide User Manual

Page 118

Advertising
background image

Publication 1757-IN510A-EN-P - October 2003

4-34 ProcessLogix Server Upgrade Procedures

8. Restart SERVERB.

Transferring R400.0 SP2 or R500.1 Data to the R510.0 Server

1 . Click Star t

Run.

2. Enter >cmd< and click OK to open the DOS window.

3. If you have a non-redundant server:

a. Enter >xcopy T:\UpgradeData\*.* C:\UpgradeData /E< and

press <Enter>.

b. If necessary, enter >D< to specify that UpgradeData is a

directory.

4. If you have a redundant Server pair,

a. On

SERVERA, enter >xcopy T:\UpgradePrimaryData\*.* C:\

UpgradePrimaryData /E< and press <Enter>.

b. If necessary, enter >D< to specify that UpgradeData is a

directory.

c. On

SERVERB, enter >xcopy T:\UpgradeBackupData\*.*

C:\UpgradeBackupData /E< and press <Enter>.

d. If necessary, enter >D< to specify that UpgradeData is a

directory.

5. Close the DOS window(s).

Copying R400.0 SP2 or R500.1 Data to the R510.0 Server is complete.
Return to the checklist that led you to this task.