Setting cnb module nut timing, Setting cnb module nut timing -15 – Rockwell Automation 1757-SWKIT5100 ProcessLogix R510.0 Installation and Upgrade Guide User Manual

Page 199

Advertising
background image

Publication 1757-IN510A-EN-P - October 2003

Firmware Maintenance Procedures 7-15

Setting CNB Module NUT Timing

Use the procedure in the following table to adjust the NUT (Network
Update Timing) timing of all the

new CNB modules in your system.

1 . If this is the fir st time you have used Network Tools on this PC,

refer to Making First Time Network Tools Settings on page 8-10
and then complete the following steps, starting with Step 6.

2. Click Star t

Run.

3. Enter this command:

>ntools -c -pg<

ATTENTION

!

You only need to adjust the NUT timing on

new

CNB modules received from the factory. You can
skip this procedure if you have previously set the
NUT timing for all the CNB modules in your system.

The CNB modules must be on a ControlNet that is
plugged into a rack, cabled to the ControlNet, and
have unique MAC addresses in order to change their
ControlNet parameters (as listed in Step 10 on
page 7-16) The ControlNet parameters are updated
for all CNBs on the ControlNet at the same time.

ATTENTION

!

If you are including a Foundation Fieldbus Linking
Device in your application, review the CNB
restrictions covered in the Linking Device
Implementation Guide
in Knowledge Builder for
NUT timing data specific to Fieldbus applications.

TIP

If the RSLinx and PCIC driver services for system
communications in ControlNet mode are not
running, this command starts the services.

Advertising