Reloading controllers – Rockwell Automation 1757-SWKIT5100 ProcessLogix R510.0 Installation and Upgrade Guide User Manual

Page 125

Advertising
background image

Publication 1757-IN510A-EN-P - October 2003

ProcessLogix Server Upgrade Procedures 4-41

Reloading Controllers

1 . Click Star t

Pr ograms Pr ocessLogix Engineering Tools

Contr ol Builder.

2. In the Login dialog box, make these entries:

a. Enter >mngr< as the default User Name.

b. Enter the appropriate Password.

c. Enter the appropriate Server name in the Server Name field.

d. Select

Classic Ser ver Secur ity in the Domain Name

drop-down list.

3. Click OK.

4. In the Project tab, confirm that the components of your

configured control strategy are listed in the Root directory.

5. Download each CPM and SRM to its given Controller.

6. Download the database (contents of each CPM’s CEE) to the

Controller.

7. In the Monitoring tab, activate the CEE and all of its components

in a given Controller.

8. Close Control Builder.

Backing Up a ProcessLogix Server Hard Drive to Tape

Performing backups is an essential part of maintaining your system.
You should back up all the files under the data directory, as well as
any user files you create. Refer to Backing Up a ProcessLogix R510.0
Server to Tape on page 8-8
.

Advertising