Synchronizing server databases on redundant server, Confirming databases are synchronized, Confirming databases are synchronized -20 – Rockwell Automation 1757-SWKIT5100 ProcessLogix R510.0 Installation and Upgrade Guide User Manual

Page 180

Advertising
background image

Publication 1757-IN510A-EN-P - October 2003

6-20 Additional Redundant Server Procedures

7. Logon to SERVERB as ps_user.

Synchronizing Server
Databases on Redundant
Server

1 . On SERVERA, click Star t

Pr ograms Pr ocessLogix

Ser ver

Station.

2. Click View

System Status Server Redundancy.

The Primary Server and Backup Server should be running and at
least one link is OK. If this is not the case, review the prior
redundancy configuration steps before continuing.

3. Click the Oper field in the lower right corner of the display.

4. Enter >mngr< in the Station Logon dialog box and click OK.

5. Click Synchr onize.

6. When the Synchronize Databases (Y/N) prompt appears, enter

>Y< in the entry field above the display and press <Enter>.

Depending on your configuration, this may take some time to
complete.

7. Once the Synchronization Complete prompt appears, verify that

the display shows simulated Green LED indications for the
following states:

8. Click Station

Exit.

9. Click Yes to exit Station.

Confirming Databases are Synchronized

1 . On SERVERA, click

Star t

Run.

2. Enter >cmd< and click OK to open the DOS window.

LED(s)

State(s)

Primary Server

Running

Backup Server

Synchronized
Running

Link Status

Link 0 (LNK00) - OK Active link
Link 1 (LNK01) - OK (Only applies if you are using a dual LAN)

Advertising