6 Configuration

viva 1.0 (for Process analysis)

■■■■■■■■

689

Production date

Production date of the solution.

Dosing unit

Shows the dosing unit to which the solution is assigned.

Expiry date

Expiry date of the solution. If solution monitoring is enabled and the set
date is before the current date (i.e., the working life has expired), then the
date will be shown in red.

GLP test date

Date of the last GLP test.

Next GLP test

Date on which the next GLP test is to be carried out.

Additional columns from the solution properties can be displayed with the
[Edit]

Column display... menu item.

NOTE

Lines that contain red entries will also show the line number highlighted
with a red background.

Table view
The solution table cannot be edited directly. Click on the column title to
sort the table according to the selected column in either ascending or
descending order. The table view can be adapted with the left mouse but-
ton as follows:

Dragging the margin between column titles:
Sets the column width

Double-clicking on the margin between column titles:
Sets the optimal column width

Dragging the column title:
Moves the column to the required location

If the content of a field is larger than the column width, then the entire
content will be shown as a tooltip if the mouse cursor hovers over the
field.

Functions
The [Edit] menu beneath the solution table contains the following menu
items: