3 loading a view, 4 saving a view – Metrohm tiamo 2.3 Patch 1 (process analysis) User Manual
Page 219

■■■■■■■■■■■■■■■■■■■■■■
4 Database
tiamo 2.3 Patch 1 (for Process Analysis)
■■■■■■■■
203
Remove the selected subwindow from the view.
Move the selected subwindow upward (modifies sequence).
Move the selected subwindow downward (modifies sequence).
4.1.7.3
Loading a view
Dialog window: Workplace / Database / Configuration
▶ View ▶ Load
view...
▶ Load view
The symbol
or the menu item View
▶ Load view... opens the dialog
window Load view.
Name
Name of the view to be loaded.
[Rename]
Rename the selected view.
[Delete]
Delete the selected view.
[Load]
Load the selected view.
4.1.7.4
Saving a view
Dialog window: Workplace / Database / Configuration
▶ View ▶ Save
view...
▶ Save view
The symbol
or the menu item View
▶ Save view... opens the dialog
window Save view.
Name
Name under which the view is to be saved.
[Rename]
Rename the selected view.
[Delete]
Delete the selected view.
[Save]
Save the view under the given name. The saved views are globally valid
and available for client/server systems.